Bedrock Exteriors of RiversideStorm damage, leaks, full replacements — handled locally.(951) 589-3318Price my roof

Guide

The questions that separate the quotes

Every contractor will answer these. The differences between the answers are where the useful information is.

Or call (951) 589-3318
Guide7 sections1 min readRiverside, CA

Get it looked at

Three questions, and up to three Riverside contractors. Free either way.

Or call (951) 589-3318

Free · Up to three quotes

Get it looked at

Three questions, and up to three Riverside contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

"Can I see a job you finished five years ago?"

Anybody can show you a roof completed last month. A roof that has been through five winters shows how the edges, valleys and penetrations were actually detailed.

"What underlayment, and how are the valleys done?"

This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.

"What does your workmanship warranty cover, and for how long?"

Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.

"What is your licence number, and who holds it?"

Then look it up. You are checking that the licence is current and that the name on it matches the name on the contract you are being asked to sign.

"What happens if the decking is rotten?"

You want a rate, not a reassurance. Some rot is likely on any older roof and the rate is the only thing that keeps that predictable.

"Who is actually doing the work?"

Ask how long this specific crew has worked together. Roofing companies keep their name and change their hands more often than most trades.

In short

Six questions, three contractors, one afternoon. It is the cheapest insurance available on a job this size.

Related questions

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

What time of year is best to re-roof in Riverside?

Here, the long dry run from May to October is the easy window. November through March is when the phone rings hardest, which means less flexibility on dates and less room on price.

How much deposit is normal?

Ten to thirty per cent is ordinary, and is often used to order material. A demand for full payment up front is a reason to walk away.

Get it priced

No cost, no obligation, and never more than three contractors.

(951) 589-3318Call nowPrice my roof